Sign in

Bid on the right RFPs. Miss nothing.

DeelSignal reads the RFP, extracts every requirement, scores whether it’s worth bidding, and drafts cited answers around your win themes. Your team reviews, approves pricing, and downloads a branded Word, PDF or PowerPoint response.

Every requirement trackedEvery answer citedPricing needs a person
Illustration of the RFP workspace listing each question with its drafted answer and review statusIllustration of the RFP workspace listing each question with its drafted answer and review status
Product illustration
Bid / no-bid

Decide in an hour, not a week.

Before anyone writes a word, DeelSignal scores the opportunity on five reasons and shows its working. A sales leader makes the call. The scoring learns from your past outcomes.

  • 01Product fit measured against extracted requirements
  • 02Relationship, competition and incumbent signals from your CRM notes
  • 03Capacity checked against deadlines and expert load
78Bid
RFP-114 · due in 18 daysHarbor County Health · Patient portal modernisation

Strong fit with most must-haves met by existing features. Worth the team’s time.

  • Product fit9/1041 of 46 must-haves met with existing features
  • Relationship7/10Two discovery calls with the IT director before release
  • Competition6/10Incumbent contract ends; no lock-in in the terms
  • Capacity vs deadline8/1018 days, 4 relevant experts available
  • Commercials8/10Within the normal discount band
Recommend bid. Fix the 120-day go-live gap (R-044) in the implementation plan and lead with the security answers.
Illustrative sampleScores out of 10
Requirements & compliance

Every “must”, accounted for.

Requirements are pulled from the RFP body, appendices and forms, then mapped to the section of your response that answers them. Gaps show up while there’s still time to fix them.

118 comply17 partial7 exception
IDRequirementPriorityAnswered inStatus
R-012Single sign-on via SAML 2.0 for all staff usersMust3.2 IdentityComply
R-027Data hosted in the United States onlyMust4.1 HostingComply
R-044Go-live within 120 days of contract awardMust5.3 TimelinePartial
R-058Accessibility conformance to WCAG 2.1 AAShould3.6 AccessComply
R-063On-site training for 40 staff across three locationsShould6.2 TrainingException
R-071Three references from comparable public bodiesMust8.1 ReferencesComply
R-088Quarterly service reviews with named account leadShould7.4 SupportPartial
Illustrative sample · 7 of 142 rowsShowing 7
Drafting

Win themes in every section, proof under every claim.

Set three or four win themes once. Agents weave them through each section and cite every factual claim to an approved source: case studies, security policies, product docs and past winning answers.

  • 01Themes tracked per section, so none goes missing
  • 02Claims without an approved source are flagged, not invented
  • 03
    Customer names and prices sanitized before drafting. How it works
Win themes
ALive in 90 daysBClinician time backCSecurity without friction

5.3 Implementation approach

We propose a phased rollout that brings the patient portal live in 90 days, well inside the required 120.1 Single sign-on and US-only hosting are configured in week one, so staff never manage another password.2 Comparable rollouts reduced front-desk call volume within the first quarter.3

1Implementation playbook v3 · Phase planApproved
2Security overview 2026 · Identity & hostingApproved
3Case study (anonymised) · Regional clinic groupApproved
Illustrative sampleThemes A · B · C covered
Team & review

Sections have owners. Reviews leave a trail.

Assign sections to people, not to a shared inbox. Contributors get asked in Slack or email, the proposal manager sees progress in one place, and every edit and approval is recorded.

  • 01Experts answer from Slack or email, no seat needed
  • 02Tracked review stages: draft, SME, proposal manager, final
  • 03Who changed what, and which source they used
SE
Solution & architectureSales engineer · 2 SMEs contributing
90%
GR
Security & hostingGRC lead · drafted from library
100%
DL
ImplementationDelivery lead · waiting on 2 answers
55%
PM
Executive summaryProposal manager · after pricing
20%
14Draft
9SME review
6Proposal mgr
3Final
Illustrative sampleSections by review stage
Pricing approval

No price leaves without a yes.

Agents never write pricing. The commercial section is built from your price book, checked against discount policy, and held until the right person approves it. Prices are sanitized before any model sees the rest of the proposal.

  • 01Discount thresholds route to the right approver
  • 02Approval is recorded with the version it applied to
  • 03Changing a line after approval reopens the approval
Commercial proposalAwaiting approval
Platform subscription · 3 years$412,000
Implementation & training$64,000
Premium support$36,000
Multi-year discount−18%
Above policy. Discounts over 15% need sales leader approval before export.
Illustrative sample · not DeelSignal pricing
Deadline risk

Know it’s late while it can still be fixed.

DeelSignal forecasts each section from its open questions, expert response times and review stage, and tells the proposal manager what’s at risk days before the due date.

RFP-114 · Harbor County Health
9 days leftDue Fri, 14 Nov · 17:00
2 sections at risk
Executive summaryAfter pricing
SolutionOn track
SecurityDone
ImplementationAt risk
CommercialApproval
Implementation waits on two SME answersDelivery lead last replied 3 days ago. Escalation suggested today.
Commercial needs pricing approvalExecutive summary can’t start until commercial terms are set.
Forecast finish: Wed, 12 NovTwo working days of buffer if both are cleared by Friday.
Illustrative sample
Export

Ready to submit, under their logo.

Proposals come out on your template with the buyer’s logo on the cover, sanitized values restored only in the final file, and the compliance matrix attached.

Illustration of the export template designer with a branded document previewIllustration of the export template designer with a branded document preview
Product illustration
DOCX · PDF

Proposal document

Your Word template, headings matched to the RFP’s section numbering, compliance matrix as an appendix.

PPTX

Orals & finalist deck

Win themes become the storyline. Every slide claim keeps its citation in the speaker notes.

Portal

Procurement portal

Answers listed by requirement ID with character limits checked, ready to paste field by field.

Outcome tracking

Every result teaches the next bid.

Record won, lost or no-bid with the reasons buyers give. Winning answers get promoted in the library, losing reasons feed the bid/no-bid score, and your security questionnaires reuse the same approved answers.

Outcome→Library→Bid score→Next RFP
Won
Harbor County Health · Patient portalBuyer feedback: implementation plan and security answers scored highest.3 answers promoted to “proven”
Lost
Lakeside University · Student servicesBuyer feedback: price 18% above the winning bid.Pricing signal added to bid score
No-bid
Meridian Transit · Fleet telematicsRequired on-premise hardware we don’t sell.Fit rule refined for hardware RFPs
Illustrative sampleBuyers are fictional
Questions

What proposal teams ask first.

Does DeelSignal decide whether we bid?

No. It scores the opportunity on five reasons and shows the evidence for each. A person makes the bid or no-bid call, and that decision is recorded.

Which RFP files can it read?

Word, PDF (including scanned pages), Excel response forms and portal exports. Requirements are extracted from the main body, appendices and attached forms.

Will the AI write our pricing?

Never. Pricing comes from your price book, is checked against discount policy, and needs an approver before it can be exported.

Can we use our own proposal template?

Yes. Upload your Word and PowerPoint templates once. Exports use your styles, with the buyer’s logo on the cover.

We already use Loopio or Responsive. Do we have to switch?

No. Import your existing library and start with the RFPs your current tool handles poorly. Approved answers carry their sources across.

How is an RFP counted for pricing?

An RFP is one project and a security questionnaire is half. See pricing (draft pricing, subject to change).

Book a demo

Bring an RFP you’re deciding on. Leave with a score.

We’ll run bid/no-bid on a live opportunity and extract its requirements into a compliance matrix while you watch.